Question

[119]. Read the following passage carefully:

Passage: "A mountain village was cut off from the nearest town by a deep gorge. Children crossed a dangerous rope bridge to reach school, and sick people could not be carried across safely. An engineer named Dev, who had grown up in the village, returned after his studies and decided to build a strong footbridge. He studied the gorge, collected local stone and steel cables, and trained village youth to help him. The work took two years and many setbacks, including a flood that washed away the first foundation. Dev did not give up. When the bridge was finally opened, the whole village walked across it together, and the school attendance doubled within a year." What setback did Dev face during the work?

1.
The village youth refused to learn any skill.
2.
A flood washed away the first foundation.
3.
No stone was available in the whole region.
4.
The government ordered the work to stop.
Answer (Detailed Solution Below)

Option 2 : A flood washed away the first foundation.

Advertisement

Detailed Solution

सही उत्तर A flood washed away the first foundation. है।

Key Points

The flood washing away the first foundation is the setback named in the passage.

Helpful?
Latest Exam & Job Updates
Last updated on Oct 26, 2026

Recommended Test Series

Attempt full-length mock tests, sectional papers & All India Rank

Explore All
NEW
Nursing, AIIMS & Madical Exams

AIIMS CRE Social Security Officer, Manager Grade-II & Superintendent Test Series 2026

PREPSNAP STUDY
AIIMS CRE Social Security Officer, Manager Grade-II & Superintendent Test Series 2026 Logo

AIIMS CRE Social Security Officer, Manager Grade-II & Superintendent Test Series 2026

0.4k Users

20 Total Tests


English, Hindi
  • •20 Full Test (Prelims)
SSC Exams

SSC GD Constable Test Series

PREPSNAP STUDY
SSC GD Constable Test Series Logo

SSC GD Constable Test Series

7.5k Users

145 Total Tests


English, Hindi
  • •15 Full Test (Prelims)
  • •50 Sectional Test
  • •55 Chapter Test
  • +25 more tests
NEW
DSSSB

DSSSB Junior Scientific Assistant (LieDetection) Test Series 2026 | 25+ Mock Tests

PREPSNAP STUDY
DSSSB Junior Scientific Assistant (LieDetection) Test Series 2026 | 25+ Mock Tests Logo

DSSSB Junior Scientific Assistant (LieDetection) Test Series 2026 | 25+ Mock Tests

2.5k Users

120 Total Tests


English, Hindi
  • •20 Full Test (Prelims)
  • •100 Sectional Test
NEW
Nursing, AIIMS & Madical Exams

AIIMS CRE Assistant Security Officer Test Series 2026

PREPSNAP STUDY
AIIMS CRE Assistant Security Officer Test Series 2026 Logo

AIIMS CRE Assistant Security Officer Test Series 2026

0.4k Users

70 Total Tests


English, Hindi
  • •20 Full Test (Prelims)
  • •50 Sectional Test

More Mock Test Questions

PrepSnapprepsnap.in • Mock Test

Question:

[119]. Read the following passage carefully:

Passage: "A mountain village was cut off from the nearest town by a deep gorge. Children crossed a dangerous rope bridge to reach school, and sick people could not be carried across safely. An engineer named Dev, who had grown up in the village, returned after his studies and decided to build a strong footbridge. He studied the gorge, collected local stone and steel cables, and trained village youth to help him. The work took two years and many setbacks, including a flood that washed away the first foundation. Dev did not give up. When the bridge was finally opened, the whole village walked across it together, and the school attendance doubled within a year." What setback did Dev face during the work?

1.
The village youth refused to learn any skill.
2.
A flood washed away the first foundation.
3.
No stone was available in the whole region.
4.
The government ordered the work to stop.

Correct Answer: A flood washed away the first foundation.

The flood washing away the first foundation is the setback named in the passage.

Downloaded from PrepSnap (prepsnap.in)