Question
[111]. Read the following passage carefully:
Passage: "An old stone bridge in a hill town had stood for a hundred years, but one monsoon weakened its central arch. Engineers did not demolish it. They studied old drawings, numbered each stone, removed the damaged arch carefully, and rebuilt it with the same stones plus hidden steel supports. Local masons, who knew the stone's character, worked beside the engineers. When the bridge reopened, it looked unchanged from a distance, yet it could now carry heavier loads safely. The project showed that heritage can be saved not by freezing it in time, but by understanding its structure and strengthening it with care." Why did the engineers number each stone?
Option 2 : So the arch could be rebuilt in its original arrangement.
Detailed Solution
सही उत्तर So the arch could be rebuilt in its original arrangement. है।
Numbering let the arch be rebuilt stone by stone in the original arrangement.
- ->SSC CGL Admit Card 2026Download Tier — 1 Hall Ticket Region — wise, Exam Day Rules
- ->SSC CGL Exam Date 2026Tier — 1 Schedule (30 Sep–30 Oct), Shifts, City Slip & Admit Card Dates
- ->SSC CGL Exam Date 2026Tier — 1 Schedule (30 Sep–30 Oct), Shifts, City Slip & Admit Card Dates
- ->SSC CGL 2026 Notification Out10,731 Vacancies, Apply Online, Exam Dates, Eligibility
- ->SSC GD Physical Test 2026PET/PST Running, Height, Chest Standards, Dates
- ->SSC GD Constable Cut Off 2026 OutState — wise, Category — wise Cut Off Marks (Male/Female)
- ->SSC GD Constable Result 2026 Out1,97,408 Candidates Shortlisted for PET/PST — Check Merit List PDF
- ->RRB NTPC Cut Off 2026Expected CBT — 1 Cut Off, Previous Year Cut Offs (Zone — wise)
Recommended Test Series
Attempt full-length mock tests, sectional papers & All India Rank
AIIMS CRE Social Security Officer, Manager Grade-II & Superintendent Test Series 2026

AIIMS CRE Social Security Officer, Manager Grade-II & Superintendent Test Series 2026
20 Total Tests
- •20 Full Test (Prelims)
SSC GD Constable Test Series

SSC GD Constable Test Series
145 Total Tests
- •15 Full Test (Prelims)
- •50 Sectional Test
- •55 Chapter Test
- +25 more tests
DSSSB Junior Scientific Assistant (LieDetection) Test Series 2026 | 25+ Mock Tests

DSSSB Junior Scientific Assistant (LieDetection) Test Series 2026 | 25+ Mock Tests
120 Total Tests
- •20 Full Test (Prelims)
- •100 Sectional Test
AIIMS CRE Assistant Security Officer Test Series 2026

AIIMS CRE Assistant Security Officer Test Series 2026
70 Total Tests
- •20 Full Test (Prelims)
- •50 Sectional Test
More Mock Test Questions
[1]. Read the following passage carefully: Passage: "When the rains failed for the second year, the small school at Rampur lost its only pla...
[2]. Read the following passage carefully: Passage: "When the rains failed for the second year, the small school at Rampur lost its only pla...
[3]. Read the following passage carefully: Passage: "When the rains failed for the second year, the small school at Rampur lost its only pla...
[4]. Read the following passage carefully: Passage: "When the rains failed for the second year, the small school at Rampur lost its only pla...
[5]. Read the following passage carefully: Passage: "When the rains failed for the second year, the small school at Rampur lost its only pla...
[6]. Choose the correct article: ___ honest man always speaks the truth.
[7]. Choose the correct preposition: She has been suffering from fever ___ Monday.
[8]. What is the synonym of 'Abandon'?
Question:
[111]. Read the following passage carefully:
Passage: "An old stone bridge in a hill town had stood for a hundred years, but one monsoon weakened its central arch. Engineers did not demolish it. They studied old drawings, numbered each stone, removed the damaged arch carefully, and rebuilt it with the same stones plus hidden steel supports. Local masons, who knew the stone's character, worked beside the engineers. When the bridge reopened, it looked unchanged from a distance, yet it could now carry heavier loads safely. The project showed that heritage can be saved not by freezing it in time, but by understanding its structure and strengthening it with care." Why did the engineers number each stone?
Correct Answer: So the arch could be rebuilt in its original arrangement.
Numbering let the arch be rebuilt stone by stone in the original arrangement.