Question

[113]. Read the following passage carefully:

Passage: "An old stone bridge in a hill town had stood for a hundred years, but one monsoon weakened its central arch. Engineers did not demolish it. They studied old drawings, numbered each stone, removed the damaged arch carefully, and rebuilt it with the same stones plus hidden steel supports. Local masons, who knew the stone's character, worked beside the engineers. When the bridge reopened, it looked unchanged from a distance, yet it could now carry heavier loads safely. The project showed that heritage can be saved not by freezing it in time, but by understanding its structure and strengthening it with care." In the passage, 'looked unchanged from a distance' means

1.
the bridge became invisible.
2.
the bridge was never repaired.
3.
the bridge kept its old appearance although it was strengthened inside.
4.
the bridge was painted.
Answer (Detailed Solution Below)

Option 3 : the bridge kept its old appearance although it was strengthened inside.

Advertisement

Detailed Solution

सही उत्तर the bridge kept its old appearance although it was strengthened inside. है।

Key Points

The bridge's appearance stayed old while hidden steel made it stronger.

Helpful?
Latest Exam & Job Updates
Last updated on Oct 26, 2026

Recommended Test Series

Attempt full-length mock tests, sectional papers & All India Rank

Explore All
NEW
Nursing, AIIMS & Madical Exams

AIIMS CRE Social Security Officer, Manager Grade-II & Superintendent Test Series 2026

PREPSNAP STUDY
AIIMS CRE Social Security Officer, Manager Grade-II & Superintendent Test Series 2026 Logo

AIIMS CRE Social Security Officer, Manager Grade-II & Superintendent Test Series 2026

0.4k Users

20 Total Tests


English, Hindi
  • •20 Full Test (Prelims)
SSC Exams

SSC GD Constable Test Series

PREPSNAP STUDY
SSC GD Constable Test Series Logo

SSC GD Constable Test Series

7.5k Users

145 Total Tests


English, Hindi
  • •15 Full Test (Prelims)
  • •50 Sectional Test
  • •55 Chapter Test
  • +25 more tests
NEW
DSSSB

DSSSB Junior Scientific Assistant (LieDetection) Test Series 2026 | 25+ Mock Tests

PREPSNAP STUDY
DSSSB Junior Scientific Assistant (LieDetection) Test Series 2026 | 25+ Mock Tests Logo

DSSSB Junior Scientific Assistant (LieDetection) Test Series 2026 | 25+ Mock Tests

2.5k Users

120 Total Tests


English, Hindi
  • •20 Full Test (Prelims)
  • •100 Sectional Test
NEW
Nursing, AIIMS & Madical Exams

AIIMS CRE Assistant Security Officer Test Series 2026

PREPSNAP STUDY
AIIMS CRE Assistant Security Officer Test Series 2026 Logo

AIIMS CRE Assistant Security Officer Test Series 2026

0.4k Users

70 Total Tests


English, Hindi
  • •20 Full Test (Prelims)
  • •50 Sectional Test

More Mock Test Questions

PrepSnapprepsnap.in • Mock Test

Question:

[113]. Read the following passage carefully:

Passage: "An old stone bridge in a hill town had stood for a hundred years, but one monsoon weakened its central arch. Engineers did not demolish it. They studied old drawings, numbered each stone, removed the damaged arch carefully, and rebuilt it with the same stones plus hidden steel supports. Local masons, who knew the stone's character, worked beside the engineers. When the bridge reopened, it looked unchanged from a distance, yet it could now carry heavier loads safely. The project showed that heritage can be saved not by freezing it in time, but by understanding its structure and strengthening it with care." In the passage, 'looked unchanged from a distance' means

1.
the bridge became invisible.
2.
the bridge was never repaired.
3.
the bridge kept its old appearance although it was strengthened inside.
4.
the bridge was painted.

Correct Answer: the bridge kept its old appearance although it was strengthened inside.

The bridge's appearance stayed old while hidden steel made it stronger.